Global Green Growth Institute
Energy Efficiency Services Limited
Federation of Indian Chambers of Commerce and Industry
Improve the Condensate Recovery of Boiler by Flash Vessel Recovery system
S.No.
Particulars
Details
1.
Name of the Industry/Organisation
2.
Contact Person Name
3.
Designation
4.
Address for Communication
5.
City
6.
Pin code
7.
Contact Number/Mobile No.
8.
Email ID
9.
Website
S.No.
Parameter
Unit
Values
Values
Values
Soucre of Data
Rated Specifications
1.
Condensate drained per day
KL/Day
2.
Make Up water Requirement
KL/Day
3.
Condensate Recovered
KL/Day
Operating Parameters
4.
Total Operating hours
Hrs/Day
Measured/Calculated
5.
Annual operational Days
Days/Annum
Measured/Calculated
6.
Annual operational Months
Months/Year
Measured/Calculated
7.
Return Condensate Temp.
°C
Measured/Calculated
8.
Corresponding enthalpy
kCal/kg
Measured/Calculated
9.
Feed water temprature
°C
Measured/Calculated
10.
Fuel cost
Rs/Ton
Calculate/Submit to FICCI
S.No.
Parameter
Unit
Values
Values
Values
Soucre of Data
Performance Evaluation
1.
Running Boiler Efficiency
%
Measured/Calculated
2.
Corresponding fuel saving
kg/Day
Calculated
3.
Annual Fuel savings
Tons/Annum
Calculated
4.
Calorific Value of Fuel
kCal/kg
Calculated
5.
Annual Operational Days
Days/annum
Calculated
6.
Annual Cost savings
Rs. Lakh/annum
Calculated
7.
Annual GHG Emission Reduction
tCO2/year
Calculated
8.
Feed water temprature after Recovery
°C
Measured/Calculated
9.
Enthalpy of feed water
kCal/kg
Measured/Calculated
10.
Gain in enthalpy
kCal/Day
Measured/Calculated
11.
Enthalpy of feed water
kCal/kg
Measured/Calculated